Delta Maranhão Complex

Installed capacity 426 MW
Paulino Neves and Barreirinhas | MA

Delta Maranhão Wind Complex, located in Paulino Neves and Barreirinhas, is the first wind farm in the state. It has an installed capacity of 426 MW and consists of 15 projects, divided into: Delta 3, which started operations in 2017; Delta 5 and 6, with the Generation Start (COD) in 2018; and Delta 7 and 8, starting commercial operation in 2019.

More details

Installed Capacity (MW) 426
Number of Plants 15
Generation Start (COD) 2017 – 2018 – 2019
Main Supplier GE
Location Paulino Neves and Barreirinhas | MA

Image Gallery