Delta 3 Complex

Installed capacity 220,8 MW
Paulino Neves and Barreirinhas | MA

Located in the municipalities of Barreirinhas and Paulino Neves, the Delta 3 wind farms had energy sold at the A-3 and LER 2015 auctions, and began operations in 2017.

More details

Installed Capacity (MW) 220,8
Number of Plants 8
Generation Start (COD) May 2017
Main Supplier GE
Location Paulino Neves and Barreirinhas | MA